Last update: Sat Mar 2 02:07:13 MST 2019
Top |
Symbols |
Numbers |
Math |
A |
B |
C |
D |
E |
F |
G |
H |
I |
J |
K |
L |
M |
N |
O |
P |
Q |
R |
S |
T |
U |
V |
W |
X |
Y |
Z
BibTeX entry
@Article{Xie:2005:CAT,
author = "Jinxing Xie and Xijun Wang",
title = "Complexity and algorithms for two-stage flexible
flowshop scheduling with availability constraints",
journal = j-COMPUT-MATH-APPL,
volume = "50",
number = "10--12",
pages = "1629--1638",
month = nov # "\slash " # dec,
year = "2005",
CODEN = "CMAPDK",
ISSN = "0898-1221 (print), 1873-7668 (electronic)",
ISSN-L = "0898-1221",
bibdate = "Wed Mar 1 21:49:46 MST 2017",
bibsource = "http://www.math.utah.edu/pub/tex/bib/computmathappl2000.bib",
URL = "http://www.sciencedirect.com/science/article/pii/S089812210500413X",
acknowledgement = ack-nhfb,
fjournal = "Computers and Mathematics with Applications",
journal-URL = "http://www.sciencedirect.com/science/journal/08981221",
}
Related entries
- availability,
46(7)1155,
56(1)257
- complexity,
39(3)31,
40(2)417,
41(3)536,
45(10)1779,
53(6)948,
55(5)960,
56(7)1715
- constraint,
40(10)1263,
41(12)1561,
44(1)7,
48(5)805,
49(5)903,
51(1)73,
51(2)279,
52(12)1627,
53(1)21,
55(1)1,
55(1)89,
55(6)1170,
56(1)257,
56(11)2970,
58(1)95,
58(9)1844
- flexible,
57(11)1748
- flowshop,
47(12)1857
- scheduling,
39(7)117,
41(10)1379,
43(12)1521,
44(3)539,
46(10)1545,
46(10)1611,
49(9)1413,
51(2)345,
51(3)515,
51(9)1507,
51(9)1571,
52(10)1529,
53(11)1658,
53(11)1733,
55(11)2458,
56(1)151,
56(4)891,
56(5)1303,
56(8)1941,
57(1)9,
57(4)619,
58(1)39,
58(1)95,
58(6)1081,
61(9)2929
- stage, two-,
47(6)877,
47(12)1857,
57(11)1929
- two-stage,
47(6)877,
47(12)1857,
57(11)1929
- Xie, Jinxing,
44(1)263,
47(12)1857