Last update: Fri Mar 23 02:13:54 MDT 2018
Top |
Symbols |
Math |
A |
B |
C |
D |
E |
F |
G |
H |
I |
J |
K |
L |
M |
N |
O |
P |
Q |
R |
S |
T |
U |
V |
W |
X |
Y |
Z
BibTeX entry
@Article{Naderi:2011:SOS,
author = "B. Naderi and S. M. T. Fatemi Ghomi and M. Aminnayeri
and M. Zandieh",
title = "Scheduling open shops with parallel machines to
minimize total completion time",
journal = j-J-COMPUT-APPL-MATH,
volume = "235",
number = "5",
pages = "1275--1287",
day = "1",
month = jan,
year = "2011",
CODEN = "JCAMDI",
ISSN = "0377-0427 (print), 1879-1778 (electronic)",
ISSN-L = "0377-0427",
bibdate = "Sat Feb 25 13:24:31 MST 2017",
bibsource = "http://www.math.utah.edu/pub/tex/bib/jcomputapplmath2010.bib",
URL = "http://www.sciencedirect.com/science/article/pii/S0377042710004516",
acknowledgement = ack-nhfb,
fjournal = "Journal of Computational and Applied Mathematics",
journal-URL = "http://www.sciencedirect.com/science/journal/03770427",
}
Related entries
- completion,
235(3)593
- machine,
233(10)2481,
234(4)1338,
234(8)2609,
236(9)2235,
236(14)3409,
263(z)288
- open,
236(16)4119
- parallel,
233(8)1850,
233(9)2322,
233(9)2351,
233(11)2779,
234(7)2250,
234(10)3025,
235(7)1826,
235(9)3053,
235(15)4464,
235(18)5357,
236(3)308,
236(3)319,
236(3)326,
236(5)843,
236(6)1226,
236(15)3584,
237(1)182,
237(1)335,
256(z)36,
259(z)651,
261(z)287,
270(z)109,
270(z)283,
270(z)330,
271(z)180,
271(z)285
- scheduling,
270(z)545
- time,
233(8)1785,
233(8)1937,
233(9)2395,
233(10)2631,
233(10)2675,
233(12)3167,
234(2)557,
234(6)1886,
234(6)1912,
234(6)1953,
234(8)2483,
234(8)2616,
234(9)2663,
235(2)460,
235(3)646,
235(5)1180,
235(5)1189,
235(8)2015,
235(8)2170,
235(9)3063,
235(13)3841,
235(17)4916,
236(3)411,
236(6)997,
236(9)2553,
236(10)2706,
236(13)3073,
236(13)3198,
236(13)3286,
236(15)3665,
236(18)4700,
236(18)4756,
237(1)384,
239(z)25,
244(z)102,
252(z)75,
256(z)104,
259(z)65,
259(z)385,
259(z)682,
259(z)905,
262(z)304,
262(z)333,
266(z)61,
271(z)328,
272(z)41
- total,
235(8)2502,
236(8)2223,
238(z)95,
263(z)103