Last update: Wed Jul 13 02:04:01 2016
Top |
Symbols |
Math |
A |
B |
C |
D |
E |
F |
G |
H |
I |
J |
K |
L |
M |
N |
O |
P |
Q |
R |
S |
T |
U |
V |
W |
X |
Y |
Z
BibTeX entry
@Article{Held:1999:SL,
author = "Gilbert Held",
title = "Switching by the Layer",
journal = j-SYS-ADMIN,
volume = "8",
number = "12",
pages = "63--67",
month = dec,
year = "1999",
CODEN = "SYADE7",
ISSN = "1061-2688",
bibdate = "Sat Mar 11 17:41:29 MST 2000",
URL = "http://www.samag.com/",
abstract = "What began as a gradual move toward switched-based
equipment during the early to mid 1990s is now a
full-scale migration. Held discusses the advantages and
disadvantages.",
bibsource = "http://www.math.utah.edu/pub/tex/bib/sysadmin.bib",
acknowledgement = ack-nhfb,
}
Related entries
- 6-10-8,
6(11)21,
7(3)55,
7(4)51,
7(9)z-z,
7(11)37,
7(12)41,
8(3)47,
8(6)51,
8(11)29,
9(3)61,
9(5)51,
9(6)69,
9(9)77,
9(10)47,
9(11)57,
9(12)71,
10(1)67,
10(5)z
- 7-8-57,
7(11)37,
7(11)41,
8(1)23,
8(2)47,
8(6)21,
8(8)45,
8(9)43,
8(10)43,
8(12)53,
9(1)37,
9(3)61,
9(4)59,
9(5)29,
9(5)51,
9(6)61,
9(6)69,
9(6)73,
9(7)z,
9(7)z-1,
10(1)51,
10(1)67,
10(4)59,
10(11)35,
9(7)z,
9(7)z-1,
9(8)55,
10(1)45,
10(4)63,
7(9)0,
8(1)39,
8(5)29,
8(7)35,
8(9)65,
9(6)69,
9(9)77
- advantage,
3(3)50,
7(4)59,
8(11)55,
9(9)39,
9(12)35
- during,
8(7)35
- early, 7-12-25,
8(9)43
- equipment, 6-10-8,
10(11)41
- Held,
6(11)21,
7(3)55,
7(4)51,
7(9)z-z,
7(11)37,
7(12)41,
8(3)47,
8(6)51,
8(11)29,
9(3)61,
9(5)51,
9(6)69,
9(9)77,
9(10)47,
9(11)57,
9(12)71,
10(1)67,
10(5)z
- layer, 6-10-8,
9(10)47
- migration,
7(9)47,
10(3)53
- move,
10(5)43,
11(3)z
- toward,
10(7)49
- what,
5(10)23,
8(1)37,
8(2)47,
8(5)53,
8(6)57,
9(9)23,
9(9)z,
9(12)39,
10(1)51,
10(2)65